Work accomplished

Comprehensive Transportation Study for MMR

Primary Surveys

 

Sl.No.

Primary Survey

Extent

Purpose

1

Home Interview Survey (HIS)

66,000 Households

Socio-economic characteristics

Travel characteristics of internal travel

2

Classified Volume count and OD Survey at Outer Cordon Locations

24 Hr., 9 Locations

Travel characteristics of external travel

External travel demand for the base year

 

3

Classified Volume count and OD Survey at Sub-regional Cordon Locations

24 Hr., 20 Locations

Validation of travel demand assessed from HIS analysis

Validation of travel demand models

4

Classified Volume count at Inner Cordon Locations

16/24 Hr., 33 Locations (OD Survey at 3 Loc.)

5

Screen Line Points

16 Hr., 3 Locations

6

Mid-Block Locations

16 Hr., 11 Locations

7

Level Crossing Locations

16 Hr., 5 Locations

8

Onboard Sub-urban Rail Passenger Surveys

6.17%

9

Sub-urban Rail Passenger Surveys: Alighting Surveys at Stations

16%

10

Operational Characteristics of Bus and Rail Transport Networks

5700 Bus Routes and 1767 Train Services

Input for preparation of public transport network

11

IPT (Auto and Taxi) Surveys

50 Locations

Preparation of Parking Policy for MMR

12

Bus Terminal Surveys

13 Bus Terminals

Assessment of terminal requirements for the horizon period

13

Airport Terminal Surveys

2000 air passengers

Assessment of terminal requirements for the horizon period

14

Goods Terminal Surveys

20 Goods Terminals

Goods travel characteristics

Estimation of internal goods travel

Assessment of goods terminal requirement for the horizon period

15

Speed-Flow Studies

16 Carriageway Types

Development of volume-delay (speed-flow) functions for assignment models

16

Journey Speed and Delay Studies

550 Kms

Base year travel characteristics

17

Network Inventory

2,300 kms.

Preparation of transport networks for the base and horizon years

18

Pedestrian Surveys

50 Locations

Identification of grade separated pedestrian facilities

19

Parking Surveys

50 Stretches

Parking characteristics

Preparation of parking policy for MMR

20

Workplace Based Surveys

4000 respondents

Development of trip generation rates for traffic impact assessment

Note: All the above surveys have been completed.


List of Reports Submitted

(As on 8th January, 2008)

 

Report No / Working Number No

Name of the Report/ Working Paper

Month of Submission

Report 1

Inception Report

Volume I : Main Report

Volume II: Workshop Proceedings

February, 2005

Report 2

Volume I: Modelling Methodology

Volume II: Household Survey Preliminaries; Questionnaire Design & Sampling Techniques

July, 2005

Technical Note

Methodology for Estimation of Rail Passenger Trips

July, 2005

Report 3

Interim Report on Traffic & Inventory Surveys, Road & Rail Network Coding and Development

Volume I: Outer Cordon Survey & Analysis

Volume II: Road Network Inventory Survey & Analysis

August, 2005

Working Paper No 1

Planning Parameters

December, 2005

Working Paper No 2

MMR Landuse

December, 2005

Working Paper No 3

Demography

Volume I: Base Year (2005) Population in MCGM

Volume II: Base Year (2005) Population in MMR 

Volume III: Population Forecast for MMR

December, 2005

Working Paper 4

Economy

December, 2005

Report 4

Report on Field Surveys

Volume I: HIS Analysis

Volume II: Other Surveys

February, 2006

Working Paper 5

Link Travel Time Functions

February, 2006

Working Paper 6

Sub Regional Cordon Analysis

February, 2006

Working Paper 7

Estimation of Rail Passenger Trips

March, 2006

Working Paper 8

Airport Terminal Studies

September, 2006

Working Paper 9

Bus Terminal Studies

September, 2006

Study Progress Note

Note on Progress of the Study to High level Steering Committee

March, 2006

Report 5

Report on Data Compilation and Statistical Analysis

Volume I: HIS Analysis

Volume II: Other Surveys

 

May, 2006

April, 2006

Report 6

Report on Development and Validation of CTS Model, Scenario, Travel Demand Forecast

Volume I: Base Paper for Scenario Development

Volume II: Scenario Development

Volume III: Development and Model Validation

May, 2006

April, 2006

September, 2006

September, 2006

October, 2006

Report 7

Report on Long Term Strategy for the Transport Sector

April/ May, 2007

Working Paper 10

Common Ticketing System

February, 2007

Working Paper 11

Vehicle Availability Model 

February, 2007

Working Paper 12

Inter-City Rail Passenger Studies

February, 2007

Working Paper 13

Parking Policy for MMR

February, 2007

Working Paper 14

Pedestrian Studies

February, 2007

Working Paper 15

Passenger Water Transport Studies

February, 2007

Working Paper 16

Institutional Studies for MMR

February, 2007

Working Paper 17

Ports of MMR

February, 2007

Working Paper 18

VOC & VOT – Framework for Economic Analysis

June, 2007

Report 8

Alternatives Analysis for Short and Medium Term Investment Strategy

August, 2007

Working Paper 19

Workplace Surveys

September, 2007

Report 9

Draft Final Report

Under Preparation

Report 10

Final Report

 

Report 11

Executive Summary

 

 